On removing the large gable end wall to create the canteen area it exposed the wall footings which were not of the size the structural engineer had expected. This has made him recalculate the amount of steel that is needed for the footings to support the opening. "Lots of steel and concrete"
See Detail below
No comments:
Post a Comment